The first visit of 2014, and what a change from December 2013 (below)! There has been a lot of landscaping - the outside appearance has changed considerably and the fountain (right) is under construction, but it’s indoors that there is most noticeable difference. | ||||
![]() |
||||
![]() |
![]() |
|||
The main hall now has its chandeliers in place, some are covered for protection before the official opening later on. The library (below) is now awaiting its finishing touches. |
||||
![]() |
![]() |
|||
![]() |
![]() |
|||
The decor has come a long way since September (below) | ||||
![]() |
![]() |
|||
![]() |
![]() |
|||
![]() |
![]() |
|||
The pagoda, left, which we saw in the December 2013 visit, was destroyed in the winter storms and a replacement is now being assembled. The terrace, right, leads out from the Dining Room (below right), while the corridor on the left (below) will take you into the main house. |
||||
![]() ![]() |
![]() |
|||